Renovation Cost Calculator — South Florida

Miami-Dade / Broward / Palm Beach pricing · paint · baths · kitchens · impact openings · roofs

← Back to Estimator Menu

Project Information

1.00 = SoFla baseline. 1.10 for Miami Beach / Coral Gables / waterfront

Select & Configure Renovation Scopes

Check the box on any scope to include it. Adjust the inputs inside each card to dial in the numbers.

Interior painting subtotal
$0
Approx. perimeter × height
Crack repair, spalling, minor re-stucco
Exterior painting subtotal
$0
Powder / half bath(s)
$0
Hall / guest bath(s)
$0
Primary / master bath(s)
$0
Bathroom renovation subtotal
$0
Total LF of base + wall cabinets
Cabinets & installation
$0
Countertops
$0
Backsplash, tile & trim
$0
Plumbing, electrical & demo
$0
Appliances
$0
Kitchen renovation subtotal
$0
Sum of all window opening sq ft
Impact windows (supplied + installed)
$0
Impact entry doors
$0
Impact sliding doors
$0
Demo, disposal & stucco patch
$0
Impact doors & windows subtotal
$0
Actual roof surface area (not floor area)
% of plywood expected to need replacement
Roofing material & install
$0
Tear-off & disposal
$0
Decking replacement
$0
Underlayment (peel & stick, FL req.)
$0
Flashing, vents, ridge & drip edge
$0
Skylights
$0
Gutters & downspouts
$0
Roof renovation subtotal
$0

Markups, Permits & Totals

Reno margins typically higher than new build
Higher for reno — unknown conditions
Varies by scope — roofs & impact windows typically $800-2000 ea
Usually $0 unless structural/load-bearing changes
Applied to ~50% (material portion) of hard costs
Hard Construction Subtotal
$0
Sales Tax on Materials
$0
Overhead (12%)
$0
Profit (18%)
$0
Contingency (10%)
$0
Soft Costs (permits, engineering, insurance)
$0
TOTAL PROJECT COST
$0

Renovation Project

Address
Prepared for: Client
Prepared by: Contractor
Date:
Valid for: 30 days

Scope of Work

Project Investment

Hard construction subtotal$0
Sales tax on materials$0
General contractor overhead & profit$0
Contingency allowance$0
Soft costs (permits, engineering, insurance)$0
TOTAL PROJECT INVESTMENT
$0

Inclusions

See scope-of-work table above. Pricing includes all labor, materials, dumpster, demolition, cleanup, and standard-level finishes as specified. Permit drawings and inspection coordination provided by contractor.

Terms & Conditions: Pricing valid for 30 days from the date above. Figures are based on a walk-through and preliminary specifications; formal selections (tile, fixtures, cabinets, appliances, paint colors) will be finalized prior to contract. Changes to scope, finish selections, or discovery of hidden conditions (rot, termite damage, outdated electrical or plumbing not visible at time of estimate) will be documented via written change orders. Contingency is an allowance — any unused portion is credited back. This proposal is not a contract; a formal agreement with payment schedule will be executed prior to commencement of work. Contractor is licensed and insured in the State of Florida.