Project Information
1.00 = US national avg. Adjust for local market.
Cost Breakdown by CSI Division
Edit any Qty, Unit Cost, or Description. All totals update live.
| Description | Qty | Unit | Unit Cost ($) | Total ($) | % of Hard |
|---|
Markups, Soft Costs & Totals
SoFla permit + impact fees typically $15-25K
Incl. wind-load & HVHZ structural engineering
Boundary, topo, FEMA elevation cert, soils
Hurricane-zone builder's risk is premium
FL 6% + local surtax (Miami-Dade/Broward/PBC ≈ 7%). Applied to ~50% material portion.
Hard Construction Subtotal
$0
Sales Tax on Materials
$0
Overhead (12%)
$0
Profit (15%)
$0
Contingency (7%)
$0
Soft Costs (permits, A/E, survey, insurance)
$0
TOTAL PROJECT COST
$0 / sq ft
$0
Project Name
Address
Project Summary
| Heated square footage | — |
| Stories | — |
| Garage bays | — |
| Finish level | — |
Cost Summary by Division
Project Costs
| Hard construction subtotal | $0 |
| Sales tax on materials | $0 |
| General contractor overhead & profit | $0 |
| Contingency allowance | $0 |
| Soft costs (permits, A/E, survey, insurance) | $0 |
TOTAL PROJECT INVESTMENT
$0
$0 / sq ft
Scope Overview
This estimate covers the complete new construction of a single-family residence as described above. Scope includes site preparation, foundation work, structural framing, building envelope (roofing, siding, windows, doors), mechanical/electrical/plumbing rough-in and finish, interior finishes, appliances, and final site work.
Terms & Conditions:
Pricing is valid for 30 days from the date above. Figures are based on preliminary
plans and specifications. Changes to scope, finish selections, or site conditions
may affect final pricing and will be documented via written change orders.
Contingency is an allowance for unforeseen conditions; unused contingency is
credited back to the owner. This proposal is not a contract; a formal construction
agreement will be executed prior to commencement of work.